JM Davidson Engineering, D.P.C. (JMD) was subcontracted by CPL to assist with the design of a new ultraviolet (UV) disinfection system at the wastewater treatment facility (WWTF). In 2018, the New York State Department of Environmental Conservation (NYSDEC) issued the Village of Warsaw WWTF a revised SPDES permit proposing changes to their fecal coliform effluent limits and seasonal disinfection requirements. During the initial design process, CPL evaluated the disinfection alternatives and selected UV treatment as the preferred design alternative to comply with the NYSDEC’s requirements.
JMD assisted CPL in the design and preparation of contract drawings and specifications for the design of the UV system at the WWTF.
The work performed includes:
Client:
Village of Warsaw
Construction Cost:
$4.5 Million (Total Improvements)
Project Duration:
2018 – 2021
Key Services:
UV Disinfection System Design, Hydraulics, Structural Design