JM Davidson Engineering, D.P.C. (JMD) was subcontracted by CPL to assist with the development of contract documents for a series of upgrades to the Village of LeRoy’s Wastewater Treatment Plant (WWTP).
JMD was responsible for the following upgrades:
Client:
Village of LeRoy
Construction Cost:
$12 Million
Project Duration:
Construction 2020 – 2021
Key Services:
Wastewater Treatment Process Design, Structural Inspection and Design, Site Development