JM Davidson Engineering, D.P.C. (JMD) was subcontracted by CPL to perform smoke testing for the Village of Bolivar, New York as part of their sanitary sewer investigations. Smoke testing is a standard method of detecting defects in the sanitary sewer system. The process involves placing a high capacity blower on top of a sanitary manhole and blowing “smoke” into the sewer system. The smoke then escapes the sewer system through pipe connections, leaks or cracks in the pipes, or low vents in the system.
The purpose of the smoke testing was to identify potential sources of extraneous flow, infiltration and inflow (I/I), entering the sanitary sewer system.
The work performed includes:
Client:
Village of Bolivar
Construction Cost:
N/A
Project Duration:
November 2020
Key Services:
Smoke testing